Lower Turnbull Hydro 1

  • Size: 7.8 MW
  • Date Built: 2011
  • Nearest Town: Fairfield, Montana
  • Head: 150 ft
  • Flow: 700 CFS
  • Unit details: Vertical Frances; synchronous generator.
  • Penstock diameter: 108″
  • Penstock length: 2,200′
  • Additional details: Automatic trip gates installed. Irrigation water. Five miles of 69kV transmission line.

Back to Project List