- Size: 290 KW
- Date Built: 2010
- Nearest Town: Howe, Idaho
- Head: 503 ft
- Flow: 9 CFS
- Unit details: Twin jet Pelton turbine; repurposed motor, induction generator.
- Penstock diameter: 20″
- Penstock length: 10,000′
- Additional details: Rebuild of mis-designed facility. Two intake structures to collect additional water. Irrigation water.