Pancheri Hydro 1

  • Size: 290 KW
  • Date Built: 2010
  • Nearest Town: Howe, Idaho
  • Head: 503 ft
  • Flow: 9 CFS
  • Unit details: Twin jet Pelton turbine; repurposed motor, induction generator.
  • Penstock diameter: 20″
  • Penstock length: 10,000′
  • Additional details: Rebuild of mis-designed facility. Two intake structures to collect additional water. Irrigation water.

Back to Project List