South Canal Drop 1 Hydro

 

  • Size: 3.8 MW
  • Date Built: 2013
  • Nearest Town: Montrose, Colorado
  • Head: 54 ft
  • Flow: 1,000 CFS
  • Unit details: Vertical double regulated Kaplan; synchronous generator
  • Penstock diameter: 132″
  • Penstock length: 1,100′
  • Additional details: Automatic trip gates installed. Irrigation water.

Back to Projects