Tiber Dam Hydro 1

 

  • Size: 7.5 MW
  • Date Built: 2004
  • Nearest Town: Chester, Montana
  • Head: 175 ft
  • Flow: 700 CFS
  • Unit details: Vertical Frances turbine; synchronous generator.
  • Penstock diameter: 96″
  • Penstock length: 90′
  • Additional details: Failsafe bypass control to maintain river flows. Bureau of Reclamation dam.

Back to Project List