Upper Turnbull Hydro 1

  • Size: 5.7 MW
  • Date Built: 2011
  • Nearest Town: Fairfield, Montana
  • Head: 100 ft
  • Flow: 700 CFS
  • Unit details: Vertical Frances; synchronous generator.
  • Penstock diameter: 108″
  • Penstock length: 1,000′
  • Additional details: Automatic trip gates installed. Irrigation water.

Back to Project List